Elk City Reservoir (Fishing Location) 14%
1941 and designed and built under the supervision of the Tulsa District, Corps of Engineers, at a cost $19,000,000.00. Construction began in February 1962 and was completed for full flood control .... Continue to Elk City Reservoir >>